Cart

Product Price Quantity Subtotal  
STRENGTHENING Widening and Strengthening of a)Donthi to Danthanpally from km 0/0 to 2/0 40.00
40.00 ×
Maintenance works Operation and Maintenance of 2 and 4 laning of Rudhauli to Basti side approach from Km. 65.870 to Km. 122.270 of NH 28 40.00
40.00 ×
Repair Pothole Repairs to Rawanwadi to Gondia Section of NH 543 in Km. 8.400 to 16.900 40.00
40.00 ×
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction of Flyover at Km. 355.78 on NH-50 near Kharge Petrol Pump to cross over the Gulbarga-Sedam Road 30.00
30.00 ×

Cart totals

Subtotal 150.00
Total 150.00