Cart

Product Price Quantity Subtotal  
Widening Widening of existing road at Railway Xing L/C No. RV 30 at Km.2.200 of NH 353 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Improvements to (1) Narayankhed to Masanpally road 30.00
30.00 ×
Widening Widening and Improvement of 4lane of Kalibor-Numaligarh section of NH-37 from Ch.315.315-km.400.900 40.00
40.00 ×
4-laning Balance work of Up-Gradation of Tirora Gondia section of NH 753 to Two Lane with Paved Shoulders 40.00
40.00 ×
Construction of balance work NH Morshi Chandurbazar Achalpur NH 353J Re-Surfacing to Gangamula-Kottigehara SH-66 Road from ch 10.00-20.00 km in Mudigere Taluk. 40.00
40.00 ×
Bridge Operation and Maintenance of Naini Cable Stayed bridge on NH-27 40.00
40.00 ×
Building Construction of Phase II of Eklabya Model Residential School in Saharapada Block, Dist Kendujhar 40.00
40.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Repair and rehabilitation work of Major Bridge over Ghaghra River 30.00
30.00 ×
STRENGTHENING Strengthening from Km 0/000 to Km 12/300 (length 12.300 km) of NH-38 (Old NH 234) 40.00
40.00 ×

Cart totals

Subtotal 340.00
Total 340.00