Cart

Product Price Quantity Subtotal  
4 lane Construction of 4-lane Highway of Armoor Jagtiyal Mancherial Section of NH-63 from km. 29.100 to km. 65.000 Pkg-I 40.00
40.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Upgradation of the section from Sironcha to Major Bridge across Godavari River from km 321.000 to Km322.700 40.00
40.00 ×
road Construction Of NH353 J Stretch from Chandur bazarNaka to Junctionwith NH 548 C 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Formation of Panapakkam SIPCOT Approach road Km 0/0 - 0/800 40.00
40.00 ×
Application of water proof paint on the terrace of HRD block at SRP Building, CSIR-CFTRI, Mysuru Painting and repair works of Divisional Office Inspection House NH and Divisional Store 40.00
40.00 ×

Cart totals

Subtotal 200.00
Total 200.00