Cart

Product Price Quantity Subtotal  
Maintenance works Short term Maintenance of two Laning with Paved Shoulders of Bijapur Gulbarga Homnabad section of NH 50 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Community Hall Building at BC Area in Pedaogirala Village 30.00
30.00 ×
STRENGTHENING Strengthening of Madurai - Thondi road to (puliyadi thambam) Ammapattinam 40.00
40.00 ×
Maintenance works Priority Maintenance work of Dhamtari-Kanker section from Km.81.500 to Km.130.000 of NH-30 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Construction of road from km 28.50 to km 55.725 (Package-2) of Huri-Taliha section of NH-913 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Rehabilitation Upgradation and reconstruction of existing intermediate lane to 2-lane on NH-43 Ext 40.00
40.00 ×
Repair Repair and Maintenance from km 126.270 to 197.200 of NH-148B 40.00
40.00 ×
Construction of balance work NH Morshi Chandurbazar Achalpur NH 353J Const of 4L EC and at grade improve from 0.0 to 19.87 of Danapur Bihta 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Rehabilitation and Upgradation of existing intermediate lane to 2 lane from Km 0.600 on NH-34 40.00
40.00 ×
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction of Flyover at Km. 355.78 on NH-50 near Kharge Petrol Pump to cross over the Gulbarga-Sedam Road 30.00
30.00 ×

Cart totals

Subtotal 380.00
Total 380.00