|
Strengthening of Dera Bassi Barwala road from Km 0 to 7point20 Km (SH09) |
₹40.00 |
|
₹40.00 |
× |
|
Construction of High Level Bridge Across Arasalaru River at Km. 0/4 |
₹40.00 |
|
₹40.00 |
× |
|
Construction High Level bridge from km5.665 to km 6.145 of National Highway No.930 |
₹30.00 |
|
₹30.00 |
× |
|
Construction of 9 nos. FOBs between Pandoh to Manali section of NH-21 |
₹40.00 |
|
₹40.00 |
× |
|
Tamprarory rectification of Accident Prone Area Legdha Ghat in Km 41/4-6 on NH 347 B |
₹30.00 |
|
₹30.00 |
× |
|