Cart

Product Price Quantity Subtotal  
Construction of 03 (three) no. RCC Bridges at 3.20 Km, 5.10 Km, 15.20 Km of PrataphKhali Khal Construction of RCC drain from Km 68/120 to 68/244 of NH-353 30.00
30.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Upgradation of Lalapettai to Thaliyampatti - Saravanapuram Road (via) Pillapalayam 30.00
30.00 ×
Maintenance works Operation and Maintenance from Km 21.000 to 53.170 of NH319D 30.00
30.00 ×
Repair and Rehabilitation of High Level Bridge Over Mand River at KM 27/8,10 on NH 216. Rehabilitation work of Sukhajhora Bridge over river Sukhajhora 30.00
30.00 ×
Re Construction of 3 lane Minor Bridge at Km. 320.052 on RHS on Puintola Tangi section of NH 16 Reconstruction of Minor Bridge at km 9/6 of Kumaratchi - Vallampadugai road-VPM-049 30.00
30.00 ×

Cart totals

Subtotal 150.00
Total 150.00