Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Upgradation of Km 7/8 of Suriyanallur - Velappampalayam road 30.00
30.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of 03 nos. of 24X7 PHC Building each at Motu of Podia Block 30.00
30.00 ×
Widening Widening of the existing road to 2 lane with paved shoulder from km 45.750 to 47.590 of NH-57 40.00
40.00 ×
Maintenance works Performance Based Maintenance Contract PBMC for the stretches from Km 69.90 to km 84.33 of NH 766C 40.00
40.00 ×
Maintenance works Maintenance of existing stretch of NH-103 (Old NH-88) from Km. 96.500 to 131.000 40.00
40.00 ×
Repair Renovation of RCC School Building Malaiyanur PUM School 40.00
40.00 ×
Construction of balance work NH Morshi Chandurbazar Achalpur NH 353J PR to bypassed stretch in Menoor from Km 130 920 to 132 020 30.00
30.00 ×
Bridge Construction of Minor Bridge at Km 214.704 on NH 730 30.00
30.00 ×
Construction of 03 (three) no. RCC Bridges at 3.20 Km, 5.10 Km, 15.20 Km of PrataphKhali Khal Construction of 03 (three) no. RCC Bridges at 3.20 Km, 5.10 Km, 15.20 Km of PrataphKhali Khal 40.00
40.00 ×

Cart totals

Subtotal 320.00
Total 320.00