Cart

Product Price Quantity Subtotal  
Construction of balance work NH Morshi Chandurbazar Achalpur NH 353J Development and Up-gradation of 4 laning from Km 182.000 to Km 208.000 of NH -52 30.00
30.00 ×
4-laning 4-Laning of Jagtial Karimnagar Section of NH- 563 from Gangadhara at Design Ch. 28.000 to Design Ch. Ch.58.866 40.00
40.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Construction of Road Tunnel with its approaches from Shiv Murti Interchange on NH248BB/NH48 to Nelson Mandela Marg (NH-148AE) 30.00
30.00 ×
STRENGTHENING Strengthening on NH-22 New NH-05 on Kalka- Shimla-Wangtoo road from Km 208/700 to 214/00 30.00
30.00 ×
road Strengthening from Km 0/000 to Km 3/200 on NH-87 and from Km 46/275 to 48/175 of NH85 40.00
40.00 ×
Building Building Work/ Building Maintenance Work/ Should have completed one building of minimum 8 storeys with structural works. 40.00
40.00 ×

Cart totals

Subtotal 210.00
Total 210.00