Cart

Product Price Quantity Subtotal  
Maintenance works Routine Maintenance including Incident Management of Badvel to Nellore Section from Km 628.555 to Km 741.950 of NH-67 40.00
40.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River 30.00
30.00 ×
Repair Repair and Renovation of Devasiriyar Mandabam and Front RCC Mandabam in Arulmigu Thiyagarajaswamy Temple 40.00
40.00 ×
Widening Widening and strengthening of existing 2 lane with paved shoulder to 4 lane with paved shoulder from Km 67/400 to Km 70/400 of NH-353 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Health Sub Centre at Molachur panchayat in Sriperumbudur Union 30.00
30.00 ×
4-laning Development of 4Lane Partial AC Highway from Marikal to Junction with NH 167N 40.00
40.00 ×

Cart totals

Subtotal 220.00
Total 220.00