Cart

Product Price Quantity Subtotal  
Construction of balance concrete road connecting to North Gate flyover in JNPA Construction of CC Road From Minority Boys Hostel (Upgraded) to Main Road at Jewargi Town 30.00
30.00 ×
Construction of Compound wall at Gandhigram sdn at Sardarbaug under City division Junagadh  Construction of Compound Wall at Vegamangalam colony H/O 30.00
30.00 ×
Bridge Construction of High level Golpahari bridge at km 40.766 with approaches (Design Chainage from km 39.700 to km 41.500) on NH-419 30.00
30.00 ×
WATERPROOFING Procurement Terrace/ Roof Slab Water Proofing treatment to Government Schools 40.00
40.00 ×
Replacement of false ceiling flooring on and in front of the stage internal painting creating service platform externally at the auditorium Replacement of false ceiling flooring on and in front of the stage internal painting creating service platform externally at the auditorium 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Construction and Maintenance of road from Limber to Budrali Balance Work Stage 2 Package No JK03147 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Short term measures for road safety in Dhanua Ghati section of NH 2 from km 249.525 to km 261.150 40.00
40.00 ×
Maintenance works STMC estimate from 250.948 to 262.948 265.598 to 271.968 and 272.168 to 274.738 of NH 20 40.00
40.00 ×

Cart totals

Subtotal 290.00
Total 290.00