Cart

Product Price Quantity Subtotal  
road Routine Maintenance for Chilakaluripet-Vijaywada sec. of NH-16 from km.355.000 - km.357.342 40.00
40.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River 30.00
30.00 ×
Overlay on 6 lane Jaipur Kishangarh Highway from Km. 273.500 to Km. 363.885 section of NH 48 Six laning of Kagal Satara section of NH48 (old NH4)Package I from km 592.240 to km 658.000 30.00
30.00 ×
Widening PMC for Widening to 4 lane of NH 07 from Km 46.00 to 96.00 Dehradun road 30.00
30.00 ×

Cart totals

Subtotal 130.00
Total 130.00