Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Construction of NH Crossing Bridge of 4 Lane at Km 80.998 of Polavaram Irrigation Project 40.00
40.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Construction of High level bridge on tributary of river Krishna from Thotlavalluru to Pamulalanka 40.00
40.00 ×
Reconstruction of culverts at Km. 388.495, 396.407, 409.710 and 415.061 of NH26 Construction of RCC Box Cell Viaduct by Cast in Situ method on NH-29 40.00
40.00 ×

Cart totals

Subtotal 120.00
Total 120.00