Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Improvements of Hirisave Chattalli Road SH-8 from ch 63.80 to 93.80 km in Arkalgud taluk 40.00
40.00 ×
Repair Special Repair of Bridges Using UHPFRC at Km 140.200 and 171.455 in Jowai-Meghalaya Assam Border Section of NH-44 40.00
40.00 ×
Overlay on 6 lane Jaipur Kishangarh Highway from Km. 273.500 to Km. 363.885 section of NH 48 Six Laning of Surat- Nashik- Ahmednagar- Solapur- MH/KNT Border Greenfield stretch Package-IV from km 107.000 to km 146.000 40.00
40.00 ×
Building Construction of Building for Public Distribution shop beyond 500 cards in Kolathur Panchayat 40.00
40.00 ×
Bridge Construction of High Level Bridge at Km.3/4-3/6 of Ayyaneri-Ramnagar road 30.00
30.00 ×
4-laning Balance work of Up-Gradation of Tirora Gondia section of NH 753 to Two Lane with Paved Shoulders 40.00
40.00 ×
Construction of 7 nos. of FOB at Km.378.620 Km.380.080, Km.395.330, Km.417.070, Km.420.320, Km.423.210 and Km.431.640 on Aligarh - Kanpur Section of NH-34 Construction of FOB at Manada (Bangriposi) at Km.225.600 on Baharagora Singhara Section of NH 49 30.00
30.00 ×

Cart totals

Subtotal 260.00
Total 260.00