Cart

Product Price Quantity Subtotal  
Construction of 03 (three) no. RCC Bridges at 3.20 Km, 5.10 Km, 15.20 Km of PrataphKhali Khal Construction of one Major RCC Bridge of length 406.52 mtrs in Purba Medinipore 30.00
30.00 ×
blackspot Rectification of Balck Spot (Nainiha) from Km 201.100 to Km 201.600 of NH 730 30.00
30.00 ×
Repair Urgent Road repair Works in Fatally Damaged Road Sections from Km 130.95 to Km 180.154 30.00
30.00 ×
Widening Widening to 2-lane /4-lanning of NH-40 between Shillong to Dawki road 30.00
30.00 ×
Replacement of existing RCC Hand Railings with RCC Crash Barriers on National Highway No.44 Replacement of existing RCC Hand Railings with RCC Crash Barriers on National Highway No.44 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Upgradation of Maravanatham - Mettupalayam Road at Km. 0/0-4/730 30.00
30.00 ×
STRENGTHENING Strengthening of Tiruchanthur Palayankottai Ambasamuthiram Tenkasi Courtallam Shenkottai road 40.00
40.00 ×

Cart totals

Subtotal 230.00
Total 230.00