Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Resurfacing from Km 52.00 Rangpo to Km 80.00 Ranipool along NH-10 30.00
30.00 ×
Construction of High level bridge across Mallin Nalla in km 90.460 of NH-130B Construction of High Level Bridge at Km 8/8 of Sakkottai Paravayal Road in lieu of existing causeway 40.00
40.00 ×
STRENGTHENING Strengthening of existing 2Lane road from Km 24.00 to 41.00 of NH 144 30.00
30.00 ×
civil New Construction, Repair and Renovation Extension of Block Veterinary Dispensary at Pipli 40.00
40.00 ×

Cart totals

Subtotal 140.00
Total 140.00