|
Construction of Intermediate Lane Road with hard shoulder from Km 0.000 to Km 53.040 of Tato to Manigong section on NH-913 |
₹40.00 |
|
₹40.00 |
× |
|
M&R Work from km 25.600 to km 26.1 of NH-717A |
₹40.00 |
|
₹40.00 |
× |
|
Widening and strengthening to 2 lane with paved shoulder from Existing Ch Km 56.720 to Km 100.820 NH01 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of 2 lane paved shoulder in 4.122 Km and ROB on Km 70.682 to Km 106.526 on NH 150E |
₹40.00 |
|
₹40.00 |
× |
|
Construction High Level bridge from km5.665 to km 6.145 of National Highway No.930 |
₹30.00 |
|
₹30.00 |
× |
|