Cart

Product Price Quantity Subtotal  
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Renewal work of 4 lane flyover in Ch. 40.150 of NH-72A (307) 40.00
40.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 40.00
40.00 ×
STRENGTHENING Strengthening of NH 748 from Km. 118.00 to Km. 125.00 Khandepar to Safa Masjid 40.00
40.00 ×
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Rehabilitation of AKG Fly over in Kozhikode district 40.00
40.00 ×
Maintenance works MAINTENANCE OF CC PAVEMENT ON SAWAI MADHOPUR SHEOPURA ROAD NH-552 EXT. 40.00
40.00 ×

Cart totals

Subtotal 200.00
Total 200.00