Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Construction of District main Road form 2.50 KM to 3.35 KM along with across drainage for connecting Chandrampalli Project 30.00
30.00 ×
Bridge Construction of 4 Lane ROB in lieu of level crossing No. 187 at KM. 338/0-2 30.00
30.00 ×
Bridge Construction of High level bridge across Mallin Nalla in km 90.460 of NH-130B 30.00
30.00 ×
Widening Widening Reconstruction and Upgradation to 2 lane with Paved Shoulder Four Lane configuration for the work of Sautada to Shirapur Section of NH 561 40.00
40.00 ×
Widening Widening of existing 2 lane road to 2 lane PS road from Km 0.000 to Km 26.845 of NH-127E 40.00
40.00 ×
STRENGTHENING Strengthening and widening of NH-251 30.00
30.00 ×

Cart totals

Subtotal 200.00
Total 200.00