|
Rectification of Blackspots from Km 132.650 to 176.000 on NH 563 |
₹30.00 |
|
₹30.00 |
× |
|
Widening from Intermediate Lane to Two Lane and Strengthening at km 2/0 - 5/8 of Kalangani - Thirumalaipatty road |
₹40.00 |
|
₹40.00 |
× |
|
Four laning of Viluppuram Km 0.000 to Puducherry Km29.000 |
₹30.00 |
|
₹30.00 |
× |
|
Construction of 3L River Bridge At Bhukhi Khadhi And Amravati Khadi |
₹30.00 |
|
₹30.00 |
× |
|
STMC of Shillong Nongstoin Road NH 44E (106) from km 21.000 to km 84.274 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of Annathana Koodam (100 Capacity) at Arulmighu Muthumariamman Temple in Thayamangalam Village |
₹40.00 |
|
₹40.00 |
× |
|
Balance work for Construction of Bypass around the Pratapgarh City on Item rate from Km 2.9 to 13.88 |
₹40.00 |
|
₹40.00 |
× |
|
Strengthening of road from Km 1 950 to 8 50 of MDR IOC Road from Hoskote Malur SH 95 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of High Level Bridge at Km. 0/6 of Paramanthur - Valathakkadu Road across Vellar River |
₹30.00 |
|
₹30.00 |
× |
|
Short Term Maintenance Contract STMC estimate from km. 35.00 to km. 38.00 of NH 326A |
₹40.00 |
|
₹40.00 |
× |
|
URGENT REPAIR AND MAINTENANCE OF REWARI INTERNAL ROAD |
₹40.00 |
|
₹40.00 |
× |
|