|
Construction of District main Road form 2.50 KM to 3.35 KM along with across drainage for connecting Chandrampalli Project |
₹30.00 |
|
₹30.00 |
× |
|
Construction of 4 Lane ROB in lieu of level crossing No. 187 at KM. 338/0-2 |
₹30.00 |
|
₹30.00 |
× |
|
Construction of High level bridge across Mallin Nalla in km 90.460 of NH-130B |
₹30.00 |
|
₹30.00 |
× |
|
Widening Reconstruction and Upgradation to 2 lane with Paved Shoulder Four Lane configuration for the work of Sautada to Shirapur Section of NH 561 |
₹40.00 |
|
₹40.00 |
× |
|
Widening of existing 2 lane road to 2 lane PS road from Km 0.000 to Km 26.845 of NH-127E |
₹40.00 |
|
₹40.00 |
× |
|