Cart

Product Price Quantity Subtotal  
Rehabilitation and upgradation to 2 lane_4 lane standards of N.H. section Bhokar to Sarsam Budruk Km.0.00 to 33.00 of N.H. 161A Periodic Overlay of Trichy to Dindigul section from Km 334.000 to Km 421.273 of NH45 30.00
30.00 ×
UNDER PASS Construction of VUP at km 172.000 at the start of Beed Bypass on Yedshi Aurangabad section of NH-52 40.00
40.00 ×
Repair Tamprarory rectification of Accident Prone Area Legdha Ghat in Km 41/4-6 on NH 347 B 30.00
30.00 ×
Widening Widening and Strengthening of Single lane to double lane of Midjil to Kothapally road from Km 0/0 to 18/0 40.00
40.00 ×
Widening Widening to 4 Lane Paved Shoulder from Km. 111.500 to 148.088 on NH 69 Old NH 206 40.00
40.00 ×
Maintenance works Annual Maintenance Work of 1 from Km 96.254 Rishi Border to Km 101.554 Rhenock Charpatak of NH-717A 40.00
40.00 ×
BAILEY BRIDGE Construction of Bailey Bridge at Teza between PWD road Tehok junction to Mini Hydro project 40.00
40.00 ×
Maintenance works Performance Based Maintenance to NH-02 from Km 311.100 to km 318.840 40.00
40.00 ×
Widening Widening to 2L PS from Km.0.00 to Km.37.850 of NH 766C 30.00
30.00 ×
Repair Repair and Maintenance of National Highway (NH-37) of Jhanji to Demow Section from Km 490.800 to Km 534.800 40.00
40.00 ×

Cart totals

Subtotal 370.00
Total 370.00