Cart

Product Price Quantity Subtotal  
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction of flyover at Sidhauli (Biswa-SadanTiraha) Km. 446.370 on Sitapur-Lucknow Sec. NH-30 40.00
40.00 ×
Widening Balance work for Widening / Improvement to 4 (Four) Lane with Paved Shoulder (Package-I) of Srirampur - Dhubri Section of NH-127B 40.00
40.00 ×
Reconstruction of culverts at Km. 388.495, 396.407, 409.710 and 415.061 of NH26 Construction of Box culvert on NH-30 (Raebareli-Prayagraj) at Arkha Mod, Unchahar 40.00
40.00 ×
4-laning Access Controlled Highway of 4 Lane with Paved Shoulders from design Ch. 26.000 to design Ch 55.800(Package 2) 40.00
40.00 ×
Building Construction of NDB building, ATU shelter and Antenna mast foundation with boundary wall at CA Kandla 40.00
40.00 ×

Cart totals

Subtotal 200.00
Total 200.00