Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Improvement and up gradation from NH227B Package-V Design Km 140.960 (Patranga) to Km 160.200 40.00
40.00 ×
STRENGTHENING Strengthening at km 11/4 - 14/0 of Velagoundampatti Elur - Puduchatiram road 40.00
40.00 ×
Widening Widening from two lane to four lane with paved shoulder from km 26/5 - 34/2 30.00
30.00 ×
Construction of Protective wall at km 3 8 4 4 of Theni Bye pass road M712 Construction of Protective wall at km 3 8 4 4 of Theni Bye pass road M712 40.00
40.00 ×
Widening Widening and Strengthening to Government Roads in Attur (H) (CandM) Sub Division (SLM-7) 40.00
40.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Repair of Bridge near Hidkal dam of Ghataprabha river on Padabudri Chikkalgudd SH-1 in Km 477.86 40.00
40.00 ×
Maintenance works Operation and Maintenance work from Km. 162.620 to Km. 278.685 NH 37 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 FORMATION OF ROAD FROM VSRH 2 JUNCTION to OUTER RING ROAD THROUGH MVRH at TIRUMALA 40.00
40.00 ×
Construction of 03 (three) no. RCC Bridges at 3.20 Km, 5.10 Km, 15.20 Km of PrataphKhali Khal Construction of Drain works in Tambaram H CandM Sub Division Jurisdiction CHN 003 40.00
40.00 ×

Cart totals

Subtotal 350.00
Total 350.00