Cart

Product Price Quantity Subtotal  
Re Construction of 3 lane Minor Bridge at Km. 320.052 on RHS on Puintola Tangi section of NH 16 Construction of Road Over Bridge In lieu of Level Crossing No.34 At Km 2/4 of SH 202 30.00
30.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Reconstruction of High Level Bridge across Keerthimannaru River 30.00
30.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Junction Improvements at Km 0/2 of Theerpatti - Thallipatti Road (SLM-128) 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Polysulphide Based Corrosion protection coating in cold area of NCU 30.00
30.00 ×

Cart totals

Subtotal 130.00
Total 130.00