|
Redevelopment of Thiruvotriyur High road from Tollgate Metro Station to New Washermanpet metro station |
₹40.00 |
|
₹40.00 |
× |
|
Construction of High Level Bridge at Km 47 6 of SH 19 |
₹30.00 |
|
₹30.00 |
× |
|
Renovation of Toilet Buildings at Ramagondahalli PUM H/O |
₹40.00 |
|
₹40.00 |
× |
|
Maintenance for TN/AP Border to Ranipet Walajahpet section of NH4 |
₹30.00 |
|
₹30.00 |
× |
|
Design and construction of Elevated structure (flyover) from Indora Chowk to Dighori Chowk |
₹30.00 |
|
₹30.00 |
× |
|