Cart

Product Price Quantity Subtotal  
Construction of 03 (three) no. RCC Bridges at 3.20 Km, 5.10 Km, 15.20 Km of PrataphKhali Khal Construction of RCC Drain in selected stretches of NH-727 (Old NH-28B) in Kushinagar district 40.00
40.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river CONSTRUCTION REPAIRING OF H.L. BRIDGE AT KHARUN RIVER IN KM.283.400 OF NH53 40.00
40.00 ×
Maintenance works Short Term Improvement and Routine Maintenance for the work of Six Laning of Section of NH-02 from km. 180.00 to km. 209.827 (PKG-I) 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 upgradation of Safety Norms in the Junction 43110 in Saoner Chhindwara Section of NH 547 40.00
40.00 ×
Re Construction of 3 lane Minor Bridge at Km. 320.052 on RHS on Puintola Tangi section of NH 16 Construction of High level Bridge at Km.8/2-6 of Chittoor-Puttur road to Udamalakurthy 40.00
40.00 ×

Cart totals

Subtotal 200.00
Total 200.00