|
Balance work of Upgrad to 4 Lane with Paved Shoulder config of the highway starting from km 88.400 to Km 163.400 sec of NH160 |
₹40.00 |
|
₹40.00 |
× |
|
Upgrad to 4Lane with Paved Shoulder config. of highway starting frm exist. km88.400 to Km163.400 of NH160 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of foot over Bridge at Ispur on km 7/300 on NH-503A under Annual Plan 2021-22 |
₹30.00 |
|
₹30.00 |
× |
|
Proposed construction of Multi Purpose Hall building at South Thaikka Street in ward no.47 |
₹40.00 |
|
₹40.00 |
× |
|
Restoration and Repair of existing NH208A from Dharmanagar to Kadamtala Trijunction |
₹40.00 |
|
₹40.00 |
× |
|
Construction of Connecting Corridor, Restrooms and Plinth Protection for SCIEnT Annex Building |
₹40.00 |
|
₹40.00 |
× |
|
Special repair works at JNV Chennithala Dist Allepey (Kerala) |
₹30.00 |
|
₹30.00 |
× |
|
Design n Construction of Kulgam Bypass on NH-444 taking off from existing chainage Km 61.650 |
₹30.00 |
|
₹30.00 |
× |
|
Construction of 4 Lane Access controlled Highway from Vakalapudi Light House to Annavaram on NH-16 |
₹40.00 |
|
₹40.00 |
× |
|