Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Construction of road from km 28.50 to km 55.725 (Package-2) of Huri-Taliha section of NH-913 40.00
40.00 ×
Construction of ROB in lieu of LC No 51 Bengalure Mysore Railway Lane near Byrapatna of SH road Construction of RUB in lieu of LC No 1 Mysore Chamarajanagra Railway Lane near Kukkarahalli Lake 40.00
40.00 ×
Resurfacing work with Bituminous Concrete in Km 165 (Mohkampur ROB) of Nh-72 (New NH-07) Resurfacing work with Bituminous Concrete in Ajabpur Flyover Service Lane in Km 161 and 162 of NH-72 40.00
40.00 ×
Construction of 03 (three) no. RCC Bridges at 3.20 Km, 5.10 Km, 15.20 Km of PrataphKhali Khal Construction of RCC Box Cell Viaduct by Box Pushing Method at chainage Km 157.200 to Km 157.500 on NH-29 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Sri Venkatappayya Shresti dormitory building 30.00
30.00 ×
Maintenance works Annual Maintenance for Tirupati-Tiruttani-Chennai section of NH-205 from Km 274.800 to Km 338.030 40.00
40.00 ×
Repair Repair and painting of Nursery School building at CPS 1 Khairi 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o CONSTRUCTION OF REST HOUSE , ANGANAVADI BUILDINGS In CMC Channapatna City Limits 40.00
40.00 ×
Maintenance works Short Term maintenance between ch. km 361/620 to 364/220 Kasbapar-Navsari Road ch. km 368/520 to 370/620 40.00
40.00 ×

Cart totals

Subtotal 350.00
Total 350.00