|
Widening to two lane with paved shoulders from Km 235.00 to 254.8 of Sindigeri Ballary section |
₹40.00 |
|
₹40.00 |
× |
|
Short Term maintenance work between Km. 0.000 to 22.800 of NH 953 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of 2 lane paved shoulder in 4.122 Km and ROB on Km 70.682 to Km 106.526 on NH 150E |
₹40.00 |
|
₹40.00 |
× |
|
Improvement to two lane with paved shoulder of Sarwan-Chakai upto NH-333 |
₹30.00 |
|
₹30.00 |
× |
|
Construction of ROB at Km 116 of NH-99 (new NH-22) at Chandwa (LC No. 12A/T) |
₹40.00 |
|
₹40.00 |
× |
|
Construction of Phase-II of Eklabya Model Residential School in Telkoi Block |
₹40.00 |
|
₹40.00 |
× |
|
Construction of 175.60 M Span PSC Box Bridge Over Panod Nala Ramnagar to Buwakhal Motor Road NH 309 |
₹40.00 |
|
₹40.00 |
× |
|