Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Restoration by filling of potholes to damaged surface of Km 0.00 to 0.500 Km.0.700 and in selected reaches on NH69 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o CONSTRUCTION OF A NEW ADMINISTRATIVE BLOCK TO GOVT POLYTECHNIC COLLEGE 30.00
30.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Construction of High Level Bridge at Km 3/2 of the Road branching from Km 29/8 across Gadilam River 40.00
40.00 ×
Maintenance Improvement and Maintenance Work at Commissioners Camp Office 40.00
40.00 ×
New Construction Of Vinayagar, Murugan Sannathi,All round Praharam Flooring in Arulmigu Pragatheswarar temple at Kadanthankudi Village Renovation of all sannathis in Arulmigu Mariamman Thirukoil Thenper,Vikravandi Taluk 40.00
40.00 ×
Maintenance works Maintenance of Pakka Saharana to Kaluwala NH-954 in the state of Rajasthan 40.00
40.00 ×
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction of Flyover at Kawas Patiya at Km14.400 and VUP at Reliance at Km11.220 on NH53 40.00
40.00 ×
Construction of Service roads at Mangalampalam, Panniyankara, Kodakara and Potta in the stretch of Walayar-Angamali Section of NH-544 Construction of Service Road and RCC Drain on both sides of NH 37A from Km 0.000 to Km 0.600 40.00
40.00 ×
Widening Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from Km 286.200 to Km 313.700 of NH 39 40.00
40.00 ×

Cart totals

Subtotal 350.00
Total 350.00