Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Upgradation of Naggaiyagoundanpatti to Kannimar Kovil Road Km. 0/0-0/6 30.00
30.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Improvements of Hirisave Chattalli Road SH-8 from ch 63.80 to 93.80 km in Arkalgud taluk 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Panchayat office Buildings at THIRUVAIGAVUR Panchayat in Papanasam Block 30.00
30.00 ×
Bridge Construction/widening of Minor Bridge at Km.63.464 and Km.65.498 on SH-95 30.00
30.00 ×
STRENGTHENING Rehabilitation and strengthening of Distressed MJB 649/1 on NH-67 30.00
30.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Health Sub Centre at Molachur panchayat in Sriperumbudur Union 30.00
30.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Rehabilitation and up gradation to 2-Lane with Paved shoulder from Km 0.000 to Km 97.864 30.00
30.00 ×
4-laning Development of 4Lane Partial AC Highway from Marikal to Junction with NH 167N 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Two Class Room in Elementry School at Keela Korukkai 30.00
30.00 ×
blackspot Temporary measures for rectification of Blackspot on NH 703A 40.00
40.00 ×
Maintenance works Performance Based Maintenance Contract (PBMC) for Mudki-Jawahar Singh Wala section i.e. from Km 0.00 to 38.00 of NH-254 40.00
40.00 ×
Maintenance works Maintenance work to Kalyan - Nirmal Road N.H. 61, Km. 43/000 to 47/000 30.00
30.00 ×

Cart totals

Subtotal 400.00
Total 400.00