Cart

Product Price Quantity Subtotal  
Maintenance works Short Term Maintenance of Nehru Nagar to Kothagudem Section of NH-930P from Km 178.500 to 230.580 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Improvement of Katapady Shirva Nandikoor SH road from Km 0.00 to Km 10.00 40.00
40.00 ×
road Construction of Long Term Measures for Rectification of MoRTH Identified Blackspots at location 1) Lambha Junction at ch. 9.568 40.00
40.00 ×
4-laning Construction work of 4-laning of Sandalpur to Nasrullaganj bypass end PkgI of NH-146B from design km 0.000 to design km 43.250 40.00
40.00 ×
Maintenance works PBMC Work for left out portion From Ch 210.830 to Ch 212.400 Dawath Bazar portion of NH-120 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 CRIF PACKAGE 07 (a) Improvement of Subramanya Udupi State Highway 37 road 40.00
40.00 ×

Cart totals

Subtotal 240.00
Total 240.00