Cart

Product Price Quantity Subtotal  
blackspot Rectification of accident prone Black spot of NH 26 from Km 72.00 to 130.280 Km 40.00
40.00 ×
Repair Short term rectification measures at 10 vulnerable locations in Trichy - Karur Section of NH-67 40.00
40.00 ×
Construction of 7 nos. of FOB at Km.378.620 Km.380.080, Km.395.330, Km.417.070, Km.420.320, Km.423.210 and Km.431.640 on Aligarh - Kanpur Section of NH-34 Construction of 9 nos. FOBs between Pandoh to Manali section of NH-21 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 One Time Improvement of Kumarghat to Kailashahar section of NH_208 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Improvement and up gradation from NH227B Package-V Design Km 140.960 (Patranga) to Km 160.200 40.00
40.00 ×
Building Construction of Anganwadi Building at Mutukrishnaperi In Melakrishnaperi Panchayat 40.00
40.00 ×
Repair Pothole Repairs to Rawanwadi to Gondia Section of NH 543 in Km. 8.400 to 16.900 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Upgaradation/ Strengthening and 5Yrs Maintenance of the 2 Roads Package No.SLM-09/2022-23 40.00
40.00 ×
STRENGTHENING Strengthening to Pune Nashik Road NH 60 in km 201.350 to 202.080 and 203.080 to 208.649 section 40.00
40.00 ×

Cart totals

Subtotal 360.00
Total 360.00