Cart

Product Price Quantity Subtotal  
Rehabilitation of distressed portion of RE wall from Km.368.753 to Km.368.908 on UP Border to Devapur (WB-09) section of NH-27 Construction of Boundary Wall West Side of Regional Office Patna 40.00
40.00 ×
Maintenance works MR work in Km 163.000 to 179.000 of NH-333A for the year 2023-24 40.00
40.00 ×
Repair and rehabilitaiton of Bridges of Purnea -Dalkhola section of NH -27 Rehabilitation of 3 nos. of Major bridges from km. 140 to 143 on NH-72 30.00
30.00 ×
Building Construction of Faculty Residential Units at NIFT Kangra, Himachal Pradesh 40.00
40.00 ×
STRENGTHENING Package No.13 - Strengthening and 5 years Maintenance of 3 Road works in Kumbakonam Block 40.00
40.00 ×
Repair and Rehabilitation of High Level Bridge Over Mand River at KM 27/8,10 on NH 216. Repair and Rehabilitation of Mayurakshi Bridge at Sainthia at km 91.200 of NH 2B 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Up gradation of NH 247 Section from Nilajphata Paoni Adayal Bhandara 40.00
40.00 ×
UNDER PASS Construction of 4-lane vehicular underpass at km 35.370 in the Ghoshpukur-Dhupguri section of NH-31D 40.00
40.00 ×
STRENGTHENING Widening and Strengthening of Existing Highway 2L PS (10M) in Km 0.00 to 21.500 NH548 40.00
40.00 ×

Cart totals

Subtotal 350.00
Total 350.00